The essential difference between a pre-loading survey and a pre-shipment inspection is purpose. A pre-loading survey records the apparent condition of cargo before loading from the perspective of carrier liability, while a pre-shipment inspection checks quantity, quality and compliance with contract terms, usually on behalf of the buyer. Both can be carried out on the same cargo.
What is a pre-loading survey for?
A pre-loading survey focuses on documenting the apparent condition of cargo before it is handed over to the carrier. Rust, wetting, mechanical damage, packing defects and storage conditions are recorded, and the result supports the remarks the master may enter on the bill of lading.
The survey is therefore usually instructed by owners, charterers or P&I clubs. Its perspective is to establish the condition in which cargo was received; product quality and contractual compliance are outside its scope.
What is a pre-shipment inspection for?
A pre-shipment inspection checks, before dispatch, whether goods meet the specifications defined in the sales contract. Product description, quantity, dimensions, packing and marking may be covered, and sampling and laboratory testing may be included where needed.
This inspection is generally instructed by the buyer or a party acting for the buyer. Some importing countries' regulations also require pre-shipment inspection for certain goods, in which case the scope follows the relevant rules.
A pre-shipment inspection report typically states whether the goods were found to conform to a given standard or to the order terms, and it may be presented to banks or authorities as part of the shipping documents.

How do the two inspections differ?
The most practical way to tell them apart is to ask which question each one answers. The comparison below summarises the differences.
- Core question: for a pre-loading survey, in what apparent condition was the cargo delivered; for a pre-shipment inspection, does the product conform to the contract
- Instructing party: usually the carrier side for a pre-loading survey; usually the buyer side for a pre-shipment inspection
- Timing: a pre-loading survey after cargo reaches the port; a pre-shipment inspection often at the mill or before dispatch
- Scope: apparent condition versus quantity, quality and specification
- Output: a condition report with suggested remarks versus a conformity report or certificate
Can the same cargo need both inspections?
Yes. On a steel coil shipment, for example, the buyer may have quality and dimensions checked against the contract at the mill. When the same cargo reaches the port, the owner may separately have its apparent condition recorded before loading.
A product found in order at the mill may still be rained on in the port stacking area or damaged in transit to the port. The two inspections are not interchangeable; they answer different questions at different times.
How do loading supervision and hold inspection fit in?
A pre-loading survey is often combined with attendance throughout loading, so that defects not visible in the stack and damage caused during handling are recorded too.
A hold inspection, by contrast, examines whether the vessel rather than the cargo is ready. Hold cleanliness, dryness and hatch cover weathertightness are important for steel cargo, but this check is treated as a separate scope from the pre-loading survey.
Keeping the scopes distinct also keeps the reports clear: each one states exactly what was examined, when and on whose instructions.
How do you know which inspection you need?
If the main need is to document the pre-shipment condition of cargo against possible damage claims arising from carriage, a pre-loading survey is the right inspection. If you need to verify that goods meet the quality and quantity terms of the contract, the scope of a pre-shipment inspection should be considered.
Contracts usually specify the type and place of inspection and who is to carry it out. Reviewing these clauses before the operation avoids commissioning an inspection with the wrong scope.
What information should accompany an inspection request?
A request should include the cargo type and list, where the cargo is located, the planned loading date, the party the report is issued to and, above all, the purpose of the inspection. Stating the purpose clearly allows the surveyor to propose the right scope.
Karan Gözetim provides pre-loading surveys from its base in Gemlik; which type of inspection a request calls for, and its scope, are clarified at quotation stage.
Frequently asked questions
Can a pre-shipment inspection report be used for B/L remarks?
Because it is prepared for a different purpose and often at a different time, it may not serve that purpose directly. For remarks, records reflecting the apparent condition at the moment of delivery to the ship are more suitable.
Does a pre-loading survey include a quantity check?
A pre-loading survey usually compares piece count and marks with the cargo list. Weight determination and quality control are not part of its core scope.
Can the same surveyor carry out both inspections?
Because scopes and instructing parties differ, they are usually carried out under separate instructions. Although one survey company may handle both, the parties should consider impartiality and potential conflicts of interest.
Topics
- pre-loading survey vs pre-shipment inspection
- what is pre-shipment inspection
- condition survey vs quality inspection
- types of pre-shipment surveys
- steel cargo pre-shipment inspection
- PSI vs pre-loading survey